boiler hydrotest procedure

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

boiler hydrotest procedure have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


boiler hydrotest procedure.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
boiler hydrotest procedure boiler hydrotest procedure boiler hydrotest procedure

TESTING AND COMMISSIONING PROCEDURE FOR

2012-12-4 · This T & C Procedure is solely compiled for use on steam boiler and calorifier installation carried out for or on behalf of the ArchSD in Government buildings of the HKSAR. There are no representations, either expressed or implied, as to the suitability of this T & C Procedure for purposes other than that stated above.

lexie@zozen.com > Get A Quote >

ASME B31.3 Process Piping Guide - engstandards.lanl.g

2009-4-1 · LANL Engineering Standards Manual PD342 Chapter 17 Pressure Safety Section D20-B31.3-G, ASME B31.3 Process Piping Guide Rev. 2, 3/10/09 4 The Owner and Designer are responsible for compliance with the personnel and process qualification requirements of the codes and standards. In particular, the application of ASME B31.3 requires compliance with the Inspector qualification

lexie@zozen.com > Get A Quote >

BOILERS, PRESSURE VESSELS, THERMAL-OIL

2013-7-16 · including valves and fittings, connected directly to the boiler without intervening valves, are to be considered as parts of the boiler. 102 A thermal-oil installation is defined as an arrangement in which thermal-oil is heated and circulated for the purpose of heating cargo- or fuel oil or for production of steam and hot water for auxiliary

lexie@zozen.com > Get A Quote >

EXCERPTS FROM: ASME BOILER AND PRESSURE VESSEL

2019-2-13 · Chapter SPS 341 APPENDIX A EXCERPTS FROM: ASME BOILER AND PRESSURE VESSEL CODE SECTION I − POWER BOILERS 2010 EDITION INTRODUCTION This Code covers rules for construction of power boilers1, electric boilers2, miniature boilers3, high−temperature water

lexie@zozen.com > Get A Quote >

Hydrotest - SlideSha

hydrotest sdp-1 v.p.shukla Slideshare uses cookies to improve functionality and performance, and to provide you with relevant advertising. If you continue browsing the site, you agree to …

lexie@zozen.com > Get A Quote >

AN ACCIDENT WITH BRITTLE FRACTURE DURING

2013-9-26 · over-pressurization. We had come across a package boiler yielding under over pressurization during a shop hydrotest about 20 years back, on this cause. 4. The hydrotest procedure adopted was wrong. The vessel volume is 100000 liters. There were no vents envisaged during hydrotest. It could be possible that blanking of flanges was done first.

lexie@zozen.com > Get A Quote >

Waste Heat Boiler Preparation - Banks Engineeri

2007-1-5 · The boiler and process lines must be completely vented in order to fill them with water. The following is a recommended procedure for hydrostatic testing: Open the steam drum vent valve and gag the safety valves in accordance with safety valve manufacturer's recommendations.

lexie@zozen.com > Get A Quote >

(PDF) Boiler Hydrotest Vicky Badaik - Academia.e

Boiler Hydrotest Kumar Rupesh Date: 04-Sep-13 Contents Boiler Hydrotest – IBR Guidelines Boiler Hydrotest – Schematics, Circuit and Procedure Dry/ Wet Preservation of Boiler September 4, 2013 Footer text 2 Boiler Hydrotest - Purpose After installation of all pressure parts and any tube replacements the Boiler is subjected to Hydrostatic pressure.

lexie@zozen.com > Get A Quote >

Presentation title, second line as need

2013-12-6 · Boiler Hydrotest – Procedure contd. September 4, 2013 Footer text 19 Dry/ Wet Preservation of Boiler As the non-drainable parts of boiler can not be drained completely, the only way to expel such water is to light-up the boiler.

lexie@zozen.com > Get A Quote >

ESS 2.21 Hydrostatic Testing Standard 2015.10.

Title: ESS 2.21 Hydrostatic Testing Standard 2015.10.30.docx Author: Curt Created Date: 11/4/2015 3:54:25 PM

lexie@zozen.com > Get A Quote >

Boiler Hydrostatic Testing - ASME (mechanical) Code

2012-4-11 · Once the boiler is placed into service, the NBIC should be the applicable code for boilers. I see no reason to conduct annual hydrostatic testing. This practice is unncessary and can result in damage to your Power Boiler. Why? Hydrostatic testing is used to find gross leaks in boiler components during new construction, and is a practice that

lexie@zozen.com > Get A Quote >