274 mw steam turbine waste heat boiler

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

274 mw steam turbine waste heat boiler have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


274 mw steam turbine waste heat boiler.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
274 mw steam turbine waste heat boiler 274 mw steam turbine waste heat boiler 274 mw steam turbine waste heat boiler

Decision framework for feasibility analysis of

It is economic and environmental feasible for the plant to recover waste steam with the steam turbine unit. The decision framework provides the feasibility of estimating the economic profit and environmental impact quantitatively for the plant recovers industrial waste heat with the steam turbine unit.

lexie@zozen.com > Get A Quote >

274 mw steam turbine waste heat boiler -

274 mw steam turbine waste heat boiler; Steam Turbines for Waste Heat Recovery - Siemens. steam boilers and one steam turbine, it is generating at least 95 percent of its power requirements from the waste heat of the incineration process itself. Operating costs have been reduced by nearly 10 percent. Until now, the plant only generated low

lexie@zozen.com > Get A Quote >

grate biomass steam boiler - ncre.

McBurney Boiler Systems - Biomass Boiler Systems. The McBurney 2-drum bottom-supported boiler is a 2-gas pass balanced draft, natural circulation boiler design. burners, McBurney air or water-cooled stationary grates, and continuous ash Steam capacities, 10,000 LB/hr to 55, 000 lb/hr

lexie@zozen.com > Get A Quote >

Boiler 10 T H Siemens In Switzerland -

Find used Gas Turbine for sale on Kitmondo. Thousands of used equipment listings to browse. Titan-130 (6700 hrs) with waste heat boiler (20 TPHsteam at 43 bar, 450°C) and 4.5 MW USED GENERAL ELECTRICS GAS TURBINE 7LM2500STIG PHGAG 08 Used Gas & Steam Turbines of Combined Cycle Power Plant in South Korea2.Equipment H Siemens HNG

lexie@zozen.com > Get A Quote >

Exergy Analysis of 4.5mw Biomass Based Steam Power

PDF On Jan 1, 2012, R.Jyothu Naik and others published Exergy Analysis of 4.5mw Biomass Based Steam Power Plant

lexie@zozen.com > Get A Quote >

Exergy Analysis of 4.5mw Biomass Based Steam Power

PDF On Jan 1, 2012, R.Jyothu Naik and others published Exergy Analysis of 4.5mw Biomass Based Steam Power Plant

lexie@zozen.com > Get A Quote >

(PDF) Failure analysis and retrofitting of superheate

Failure analysis and modeling of super heater tubes of a waste heat boiler thermally coupled in ammonia oxidation reactor. Eng Fail Anal 2012;26:285–92. [6] Daneshvar-Fatah Farhad, Mostafaei Amir, Hosseinzadeh-Taghani Reza, Nasirpouri Farzad. Caustic corrosion in a boiler …

lexie@zozen.com > Get A Quote >

Feasibility Study of Supercritical CO2 Rankine Cycle fo

2018-4-4 · power cycle that suits the medium range waste heat recovery. We have considered 1.18 MW of waste Heat source at 873 K temperature for Analysis. We performed the first law and second law analysis of these three power cycles using Engineering equation solver to do comparison study. 1) Steam Rankine Cycle 2) Transcritical CO 2 Cycle 3) Combined CO

lexie@zozen.com > Get A Quote >

Heat Recovery Boiler - sgnet.co.

WASTE HEAT RECOVERY BOILERS - Johnston Boiler . 2018-2-16 · Waste heat is a valuable resource. Johnston Boiler Company's line of single and triple pass Waste Heat Recovery (WHR) boilers offer your company a way to save valuable energy, energy typically lost in waste heat.

lexie@zozen.com > Get A Quote >

.p

2018-3-15 · Fuel Load (MW) Steam temp. at Design value for steam Spray water Failure analysis and modeling of super heater tubes of a waste heat boiler thermally coupled in

lexie@zozen.com > Get A Quote >

3x750mw Gas Turbine Combined Cycle Power Plant,

2019-1-21 · 3x750mw Gas Turbine Combined Cycle Power Plant, GE 9FA, 255MW, quotation it consists of steam turbine house, gas turbine generation unit, heat recovery steam generator and electrical building. The north area of the plant is reserved for the extension purposes. steam quality change during the operation of turbine boiler timely and

lexie@zozen.com > Get A Quote >