industrial turbine package 20 mw generator

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

industrial turbine package 20 mw generator have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


industrial turbine package 20 mw generator.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
industrial turbine package 20 mw generator industrial turbine package 20 mw generator industrial turbine package 20 mw generator

KGT - GPB80/80D (7.5MW Class) -

2019-9-13 · Ideal for reliable on-site base load power generation requiring from 6.5 MW to 7.3 MW for co-generation applications. The GPB80/80D is based on Kawasaki's proven M7A heavy duty industrial gas turbine with over 15 years of commercial experience and proven reliability.

lexie@zozen.com > Get A Quote >

Power Generation Packages - Products Solar Turbin

2019-9-18 · Solar offers factory packaged gas turbine-driven generator sets from 1-23 MW. These generator sets include industrial generators that are in compliance with DNV and ISO standards. Our standard power generation packages are suitable for operations in any environment. Our gas turbine generator packages can be used in combined-cycle systems or in combined heat and power plants, …

lexie@zozen.com > Get A Quote >

Gas Turbines 5-20 MW - Solar Taurus & GE Frame

2015-4-6 · One SOLAR Titan 130 Turbine generator, rated 13.5 MW (at standard conditions of 59 Degrees F @ Sea Level), never used . TITAN 130 INDUSTRIAL POWER GENERATOR SET The Titan 130 Industrial Power Generator (IPG) is a compact, rugged gas turbine generator set that has been designed to meet the requirements for industrial power generation applications.

lexie@zozen.com > Get A Quote >

15 MW Coal Fired Steam Power Plant Packa

2007-6-18 · This information sheet describes the packaged equipment for a coal-fired steam power plant with the output capac-ity of 15 MW. Essentially, the package consists of three main components of power generating equipment; namely the boiler, steam turbine and generator; plus some auxiliary devices associated wit these main operating compnents.

lexie@zozen.com > Get A Quote >

steam generator 3-28mw – Industrial Boil

2018-3-5 · 28mw stainless steel steam generator – ZBG Boiler generation equipment. Used 3 MW condensing steam turbine-generator set.Neyveli CONTRACT INTERNATIONAL 2×500 MW, NNTPP, Neyveli CONTRACT SPECIFICATION INOlA STEAM TURBINE GENERATOR PACKAGE – NTA2 20.1.4.3 26 27 28 Item Description Conductivity Type

lexie@zozen.com > Get A Quote >

Achieving the 20 MW Wind Turbine - Renewable

The 20 MW Innovative Turbine. While the 20 MW design was unfeasible due to issues of weight and corresponding loads, the future large-scale wind turbine system drawn up by the UpWind project is smart, reliable, accessible, efficient and lightweight. It analysed wind turbine materials, optimising the micro-structure of blade materials to develop

lexie@zozen.com > Get A Quote >

1.1 MW Turbine Powered Portable Generator 850 K

2015-8-21 · Turbine Marine (TM) Compact Series Portable Generators 1.1 MW Turbine-powered Portable Standby Generator. Turbine Marine Inc. has developed the Compact Series 1.1 MW turbine-powered portable standby generator. It is emergency industrial equipment that is so small and lightweight it can be easily towed with a standard size pick-up truck, or

lexie@zozen.com > Get A Quote >

Titan 250 - Power Generation Packages Solar Turbin

2019-9-16 · Solar Turbines' Centaur 250 gas turbine power generation packages can provide combined heat and power for all industrial applications, including institutional, renewables, commercial, and electric power, while driving a variety of generator configurations.

lexie@zozen.com > Get A Quote >

STANDARD TECHNICAL SPECIFICATION FOR MAIN

2010-12-22 · utilities and equipment manufacturers, has completed its task of finalizing standard technical specification for Main Plant Package for a coal based thermal power project having 2x (500MW or above) sub-critical units. The specification covers scope, design criteria, equipment features, quality

lexie@zozen.com > Get A Quote >

20 MW Solar Mars 100 Gas Turbine Package 12783 and

2017-8-13 · 20 MW Solar Mars 100 Gas Turbine Package TWO (2) 10 MW SOLAR MARS 100 GAS TURBINE PACKAGES, hours on exchange engines: 12783 and 17000 hours, Frequency: 50 HZ, Year 1996, started system, exhaust system, cooling system, electrical system, pumps and etc. Complete package, Gas Turbines have been well maintained by OEM with records on site.

lexie@zozen.com > Get A Quote >

LM2500 Aeroderivative Gas Turbine GE Pow

2019-9-17 · JPS has teamed with GE to modernize Bogue Power Station's generation equipment . The project started with the 120 MW combined cycle plant's conversion to dual fuel operation and is continuing with a 20 MW expansion provided by a GE LM2500+ aeroderivative gas turbine, which will contribute up to 15% of JPS's total power production.

lexie@zozen.com > Get A Quote >