Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

fondital boiler ctn rtn tbtn 24 28 have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


fondital boiler ctn rtn tbtn 24 28.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
fondital boiler ctn rtn tbtn 24 28 fondital boiler ctn rtn tbtn 24 28 fondital boiler ctn rtn tbtn 24 28

boiler Agent tube manufacturer approved by central

Power Engineers, Boiler, Pressure Vessel and … 2019-7-30 · (3) To register a design or an alteration to a design, the owner of the automated control system or the engineer, manufacturer or designer of the automated control system, if the engineer, manufacturer or designer is acting as an agent for the owner, must submit, for review by a provincial safety manager, an application that includes

lexie@zozen.com > Get A Quote >

boiler Agent tube manufacturer approved by central

Power Engineers, Boiler, Pressure Vessel and … 2019-7-30 · (3) To register a design or an alteration to a design, the owner of the automated control system or the engineer, manufacturer or designer of the automated control system, if the engineer, manufacturer or designer is acting as an agent for the owner, must submit, for review by a provincial safety manager, an application that includes

lexie@zozen.com > Get A Quote >

28 MW biomass boiler in Australia - ferienwohnung

2.8MW fast-assembly boiler for sale Small Biomass … 3 5mw and 2 8mw natural gas boiler Industrial Boiler Dec 28, 2017 · Sitong Boiler is the professor of industrial boiler manufacturer, with the certificates of ISO 9001, CE, SGS, BV,etc. 2.8mw hot water boilers supply hot water boiler 4 2 mw liquefied petroleum gas boiler in australia.

lexie@zozen.com > Get A Quote >

boiler Agent tube manufacturer approved by central

Power Engineers, Boiler, Pressure Vessel and … 2019-7-30 · (3) To register a design or an alteration to a design, the owner of the automated control system or the engineer, manufacturer or designer of the automated control system, if the engineer, manufacturer or designer is acting as an agent for the owner, must submit, for review by a provincial safety manager, an application that includes

lexie@zozen.com > Get A Quote >